Completed Projects

October 2014 – NAPA Distribution Center System in Middletown, CT

We were contracted by Century Conveyor to remove and replace the complete order picking conveyors with some new 24V DV Live Roller out to a new 6 lane sorting system( Pro-Sort Horizontal Belt Sortation ) which included compressed air system and adding to their mezzanine, all while the customer continued to pick orders and perform business as usual. All conveyors provided by Hytrol Conveyor Company.

August 2014 – FedEx Home Delivery in Stratford, CT

We were contracted by Combination Design to do the mechanical and electrical installation of a new van line, extending their sort slide system and extended several existing lines.
Conveyors provided by Hytrol Conveyor Company.

August 2014 – FedEx Ground in Willington, CT

NCS provided to IA International, CT Licensed labor me to help with their project which included tying in new conveyor line to existing conveyor, and demolition of existing equipment and sort slide.

February 2014 – San Bernardino International Airport in San Bernardino, CA

We were contracted to provide a new inbound luggage claim unit for the U.S. Customs Building. The new system was supplied by G & S Mechanical.

November 2013 – Charleston International Airport in Charleston, SC

We were contracted by Vanderlande Industries for the mechanical installation of the three new inbound conveyor systems to the three new Tri-Planner baggage claim units, complete with the infield decks.

January 2013 – Dollar Tree Distribution Center in Windsor CT

We assisted Intelligrated Material Handling Solutions with their installation at the Dollar Tree warehouse in CT. We provided them with CT licensed conveyor installers to assist them with getting the job started on time and completed on time. The system had over 5 miles of conveyor, consisting of two shoe sorters, high speed multi-lane spurs. The building was 1 million square feet in size.

October 2012 – College Park, PA in Penn State

We installed a new inbound baggage claim unit (Tri-planner Flat Plate by Vanderlande Industries). We also installed a new tri-planner make-up unit.

March 2012 – Data Mail Systems, Inc. in Windsor, CT

We relocated some existing conveyor sections, relocated and enlarged their sortation system.

February 2012 – JC Penney Distribution Center in Manchester, CT

August 2011 – February 2012: We were contracted by SDI Group to assist in the mechanical conveyor installation of the Garment portion of the system and erect the very large mezzanine which included the structure, decking, flooring and handrails and stairs. The Garment equipment consisted of a Bomb-Bay Sorter, a hanging Garment sorter and switches onto slick rail, “non-powered” and overhead chainveyors.